October 4 @ 12:00 pm - 2:00 pm

AHJ Only: Rough-In Inspection & Final Acceptance Tests

Steven Scandaliato, SET, SDG, LLC; Ken Wagoner, SET, Parsley Consulting

Room: America CD

CEU 0.2 | CPD 2.0 | CH 2.0

AHJ Track

Among the many milestones found in the process of sprinkler system design and installation, the rough-in inspection is arguably the most important. Rarely are sprinkler systems inspected and tested by the same personnel that performs the shop drawing review. As a team, installers and fire service inspectors are our last chance to “get it right” regardless of design intent and plan review accuracy. This seminar explains the synergy required in the design and installation process exposing critical areas of each needed to ensure that lives and property will be saved. A detailed discussion regarding activities included in this inspection and the importance they play will be presented.

Upon the conclusion of this seminar, the participant should be able to:

  • Identify construction types by definition(s) for each compartment and validate the approved shop drawings
  • Recognize and apply proper obstruction types and associated rules based on the construction definitions
  • Compare critical portions of the actual installation with the approved shop drawings